The implementing regulation under UU PDP was still unsigned
On the mid-2026 sources used by the verification sheet, the implementing regulation under UU PDP was still unsigned. Badan PDP, the data-protection authority the statute contemplates, did not yet exist on those sources. Watch-list item 2 holds both of those open, together with a third object: the revision of PP 71/2019, which the sheet describes as in progress. The unsigned regulation is the pending instrument. This briefing does not treat it as in force.
UU PDP 27/2022 has been fully in force since 17 October 2024. The sheet marks that claim verified and writes the caveat in the same cell. The caveat is the unsigned regulation and the authority that had not been constituted. The commencement date stays 17 October 2024. Reading the missing regulation as proof that the statute itself has not started joins two rows the sheet keeps apart.
Administrative fines stay dormant while the criminal provisions are live
Administrative fines, recorded at up to 2 percent of revenue, are dormant on the sheet. The sheet ties that dormancy to the unfinished machinery, including an authority the mid-2026 sources still did not show. Criminal provisions in the same statute are live. The pitch the sheet will accept is readiness for a statute already in force. The pitch it rejects is a claim that the regulator will impose the administrative fine.
The dormant column and the live column are both part of the verified claim. Readiness, in the wording the sheet chooses, means preparation for duties the statute already contains. It is not a forecast of an administrative penalty. It is not a waiver of the criminal provisions the sheet calls live. Collapsing the columns would describe a fine the unfinished machinery cannot yet impose, or would treat a fully commenced statute as optional.
Article 46 requires written notice within 3×24 hours
Article 46 requires written notice within 3×24 hours. The recipients on the sheet are the affected individuals and the authority. The interval is three periods of 24 hours, and it is the Indonesia entry in the sheet’s account of breach clocks. It attaches to a statute that has been fully in force since 17 October 2024. The unsigned implementing regulation does not, in that account, remove the article.
The sheet’s product note expects incident reports to export timestamps and harm-assessment fields aligned to the clocks it lists, and 3×24 hours is the Indonesia window in that list. The absence of Badan PDP does not substitute a different number. The table captioned “The statute is in force. The machinery is not finished.” places the in-force statute, the unfinished machinery, and the Article 46 notice on separate rows so the hours are not blamed on the missing regulation. Written notice within 3×24 hours, to individuals and to the authority, is the clock the prose has to be able to repeat without that table.
PP 71/2019 remains the verified hosting text while its revision is open
PP 71/2019 is verified on the sheet, and the revision of it is the third part of watch-list item 2. The verified text requires an onshore data centre and an onshore disaster-recovery centre for public-scope electronic system operators. Private operators may host offshore where access guarantees are in place. The sheet says this split matches the framing it was asked to check. The revision is in progress, driven by the UU 1/2024 ITE amendment, which is the driver the sheet names.
Public-scope systems and private systems take different hosting sentences from the text the sheet verified. A revision still in progress may redraw that map, and on the cited sources it has not done so. Watch-list item 2 holds three open items side by side: the UU PDP implementing regulation, the authority that had not been constituted, and the revision of PP 71/2019. Treating any one of them as completed would be an update the sheet does not contain.
The Constitutional Court petition remains pending
The sheet notes Constitutional Court petition 236/PUU-XXIV/2026 as pending. It says the case may force the timeline for the regulation and the authority. No order in the petition is reported here, because the sheet does not report one. There is no signed date in these sources for the implementing regulation. There is no date in these sources for the day Badan PDP comes into existence. The remark that the case may force a timeline is a reason to recheck, and the watch list asks for that recheck before external use.
Mid-2026 is the vintage of the sources on the authority and the regulation. Anything later needs a later verification before it can be briefed as a change. Under the sources already written down, UU PDP is fully in force from 17 October 2024, Article 46’s written notice runs within 3×24 hours, and the administrative fines remain dormant beside live criminal provisions. The petition, the unsigned regulation, the missing authority, and the PP 71/2019 revision stay on watch-list item 2.
How to read this
| What is in force | What is still open | Do not collapse into |
|---|---|---|
| UU PDP | Fully in force since 17 Oct 2024 | A live administrative-fine regime |
| Implementing regulation and authority | Still pending on the sheet | A reason to ignore the statute |
| Article 46 notice | Written notice within 3×24 hours | The missing regulation |